Jobsite math guides
Plain guides for jobsite math: reading a tape measure, concrete for a slab, IRC stair rules, a roof pitch chart and the board foot formula, with calculators.
- The board foot formula, with examples and a lumber chartThickness × width × length ÷ 144, with a chart for common boards and how to price an order.
- How to calculate concrete for a slab, in cubic yards and bagsThe slab formula, a table of common slabs in yards and bags, and how much extra to order.
- How to read a tape measure, marks and fractions explainedThe marks between the inches, the 16" and 19.2" marks, the hook, and adding what you read.
- IRC stair rules explained, riser, tread, headroom and handrailsThe R311.7 limits for risers, treads, rise, width, headroom, landings and handrails, with a worked stair.
- Roof pitch chart, pitch to degrees, grade and slope factorEvery common pitch in degrees, percent grade and slope factor, with how to use each number.
Same math in your pocket. Works with zero bars.
DOWNLOAD FREE
iPhone · No trial, no ads, no account